Deepak Gupta, and Sameer Sharma. “Minimizing Rental Cost under Specified Rental Policy in Two Stage Flow Shop, the Processing Time Associated With Probabilities Including Break-down Interval and Job – Block Criteria”. Journal of International Academy of Physical Sciences 15, no. 5 (October 30, 2011): 133–142. Accessed May 19, 2024. https://www.iaps.org.in/journal/index.php/journaliaps/article/view/622.