Deepak Gupta and Sameer Sharma (2011) “Minimizing Rental Cost under Specified Rental Policy in Two Stage Flow Shop, the Processing Time Associated with Probabilities Including Break-down Interval and Job – Block Criteria”, Journal of International Academy of Physical Sciences, 15(5), pp. 133–142. Available at: https://www.iaps.org.in/journal/index.php/journaliaps/article/view/622 (Accessed: 19 May 2024).