Deepak Gupta, & Sameer Sharma. (2011). Minimizing Rental Cost under Specified Rental Policy in Two Stage Flow Shop, the Processing Time Associated with Probabilities Including Break-down Interval and Job – Block Criteria. Journal of International Academy of Physical Sciences, 15(5), 133–142. Retrieved from https://www.iaps.org.in/journal/index.php/journaliaps/article/view/622