“Minimizing Rental Cost under Specified Rental Policy in Two Stage Flow Shop, the Processing Time Associated With Probabilities Including Break-down Interval and Job – Block Criteria”. 2011. Journal of International Academy of Physical Sciences 15 (5): 133-42. http://www.iaps.org.in/journal/index.php/journaliaps/article/view/622.